Design Review & Audit
We identify missing seals, under-specced wire gauges, and impossible-to-manufacture splices before you send drawings to the contract manufacturer. A bad drawing yields a bad harness.
What We Check
- Connector Derating: Ensuring pins aren't overloaded based on ambient temps.
- Bend Radii: Checking that bundles aren't forced into turns tighter than 10x their OD.
- Splice Stacking: Ensuring ultrasonic welds or crimps aren't stacked, creating an inflexible bulge.
Our turnaround time for a standard 500-circuit architecture review is 7 business days.